SEATTLE, WA – The build is slow, from the arrival of the refrigeration unit, to the assemble of the stage and live areas of the field, the times during the process in which the roof has been at various stages of closure and the anticipation of the Winter Classic.






<img src=”https://prohockeynews.com/wp-content/uploads/2023/12/20231230_181049-200×150.jpg” alt=”” width=”200″ height=”150″ class=
“alignleft size-medium wp-image-231449” />






You must be logged in to post a comment.